GS ID
5860
Region
India
Loading...
certified SDG Impacts
Project Type
Status
Gold Standard Certified Project
Project Attributes
Project Developer
KKK HYDRO POWER LIMITED
Methodology
AMS-I.D. Grid connected renewable electricity generation
Crediting Period
Oct 29, 2008 ― Oct 28, 2015
Standards Version
v2.2 CASH
Annual Estimated Credits
25,967
Project Scale
Small Scale
Project Type
Small, Low - Impact Hydro
Description
This project is located on Sanjoin nala, a tributary of Beas River near village Patlikuhl in Kullu District, Himachal Pradesh. The objective of the project activity is to harness renewable energy in the form of Hydro potential for supplying power to the state grid. The project activity has installed a total of 4.9 MW (3 MW + 1.9 MW) run-of-the-river small hydro power project to export clean power to Himachal Pradesh State Electricity Board (HPSEB) grid. The project activity was commissioned in two phases 3.0 MW commissioned Unit-I as on 05/08/2004 and Unit-II as on 19/09/2004; whereas 1.9 MW commissioned Unit-III as on 14/07/2008. The expected operational lifetime of the project is for 40 years. The project activity has been registered with UNFCCC on 29/10/2008 and the project registration number s 1253. The project opted for renewable crediting period valid and the duration of the first crediting period is from 29/10/2008 – 28/10/2015. The second crediting period of the project activity as per registered PDD is from 29/10/2015 to 28/10/2022 (renewable). Furthermore, PP has decided to register the project to Gold Standard Foundation (GS) and upgrade the CERs of last verification from CDM-CERs to GS-CERs.
Issuance List
Vintage | Quantity | Product | Issuance Date | Actions |
---|---|---|---|---|
Loading... |
Certification Documents
VIEW CERTIFICATION DOCUMENTS IN SUSTAINCERTRetirements
Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions |
---|---|---|---|---|---|---|---|
Loading... |