GS ID
6051
Region
Sri Lanka
Loading...
certified SDG Impacts
Project Type
Status
Gold Standard Certified Project
Project Attributes
Project Developer
Alternate Power Systems (Pvt) Ltd
Methodology
AMS-I.D. Grid connected renewable electricity generation
Crediting Period
Aug 24, 2010 ― Aug 23, 2017
Standards Version
2.2
Annual Estimated Credits
13,484
Project Scale
Small Scale
Project Type
Small, Low - Impact Hydro
Description
The main purpose of this project activity is to generate electricity from a small-scale hydropower plant and supply of power generated to the Sri Lankan national utility grid which is Ceylon Electricity Board. Alternate Power Systems (Pt.) Ltd. is the promoter of the proposed project activity. The project activity involves installation of run-of-river 6.5 MW mini hydro power plant in Sri Lanka.
Issuance List
Vintage | Quantity | Product | Issuance Date | Actions |
---|---|---|---|---|
Loading... |
Certification Documents
VIEW CERTIFICATION DOCUMENTS IN SUSTAINCERTRetirements
Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions |
---|---|---|---|---|---|---|---|
Loading... |