Gold Standard Foundation

60 MW Bandirma Wind Power Plant Project

GS ID

744

Region

Turkey

60 MW Bandirma Wind Power Plant Project

Loading...

certified SDG Impacts

Clean Water and Sanitation
Affordable and Clean Energy
Decent Work and Economic Growth
Climate Action

Project Type

Wind
Wind

Status

Gold Standard Certified Project

Gold Standard Certified Project

Project Attributes

Emission Reduction

Project Developer

BORUSAN ENBW ENERJI YATIRIMLARI VE ÜRETIM A.S.

Methodology

ACM0002 Grid-connected electricity generation from renewable sources

Crediting Period

Jul 24, 2022 ― Jul 23, 2029

Standards Version

Gold Standard for the Global Goals

Annual Estimated Credits

108,692

Project Scale

Large Scale

Project Type

Wind

Description

The purpose of the proposed VER Gold Standard project is to generate zero emission renewable energy from a 60 MW wind farm. Bandırma Enerji ve Elektrik Üretim Ticaret Anonim Şirketi is the owner of the 60 MW Gökburun Wind Farm Project in Turkey. The project activity is developed as Gold Standard VER project. The wind farm includes a total of 20 VESTAS V 90 turbines at an installed capacity of 3 MW each, 60 MW in total. Technical feasibility, namely wind speed measurements and power output estimations site condition analysis was done between April 2007 and October 2008. Predicted mean wind speed is 8.6 m/sec, which qualifies the site as suitable for the erection and operation of a wind park. The expected power generation for 60 MW installed capacity is 10.4 GWh/a for each turbine or 207.8 GWh/a (gross) for the entire wind park.1 Net power generation is expected to be 182.7 GWh/a. The wind park will result in reducing CO2 emissions in the range that

Issuance List

Vintage
Quantity
Product
Issuance Date
Actions

Loading...

0 of 0

Retirements

Date
Vintage
Serial Number
Quantity
Product
Status
Note
Actions

Loading...

0 of 0