GS ID
2681
Region
Turkey
Loading...
certified SDG Impacts
Project Type
Status
Gold Standard Certified Project
Project Attributes
Project Developer
Desilyon Consultancy Trade J.S.C.
Methodology
ACM0002 Grid-connected electricity generation from renewable sources
Crediting Period
Dec 01, 2016 ― Nov 30, 2023
Standards Version
Gold Standard for the Global Goals
Annual Estimated Credits
23,299
Project Scale
Small Scale
Project Type
Other
Description
Ova Wind Farm will be located in Ödemiş district of İzmir province and in Köşk district of Aydın province in Turkey and developed by Ayres Elektrik Üretim A.Ş. The project will have 9 wind turbines with a unit capacity of 2 MW each. With a total installed capacity of 18 MWm/15 MWe, the project is estimated to supply grid as 45,114 MWh per annum . Expected annual emission reductions of the project is approximately 23,299 tCO2/year which total of reduction of 163,092 tCO2-eq over the 7 year crediting period.
Issuance List
Vintage | Quantity | Product | Issuance Date | Actions |
---|---|---|---|---|
Loading... |
Certification Documents
VIEW CERTIFICATION DOCUMENTSRetirements
Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions |
---|---|---|---|---|---|---|---|
Loading... |