GS ID
1282
Region
Turkey
Loading...
planned SDG Impacts
Project Type
Status
Listed
Project Developer
GAİA CLİMATE FİNANSAL DANIŞMANLIK HİZMETLERİ VE TİCARET ANONİM ŞİRKETİ (GAIA CLIMATE)
Methodology
Not provided
Crediting Period
Aug 15, 2013 ― Aug 14, 2018
Standards Version
Gold Standard for the Global Goals
Annual Estimated Credits
70,000
Project Scale
Small Scale
Project Type
Biogas - Cogeneration
Description
The purpose of Efeler BPP Project is to use solid and liquid waste from the Efeler Farm to produce green energy. The Efeler Farm is located in Germencik district of Aydýn province in Turanlar Village, in Turkey. The BPP will have an installed capacity of 2.4 MW. The total electricity production of the project is expected to be some 19,200 MWh/year. In addition a heat generation of 22,130 MWh/year is expected. In addition to produce electricity from the solid and liquid waste, there are some other benefits of the project: • Environmental impact of waste will be eliminated. • The harmful gases, which released into the air, will be blocked. • The small amount of organic manure that occurs after the process will be evaluated in positive way. • The efficiency of milk amount will be improved due to the cold air, which will be obtained from the chiller after converting the hot water to the cold air in chiller.
Issuance List
Vintage | Quantity | Product | Issuance Date | Actions |
---|---|---|---|---|
Loading... |
Certification Documents
VIEW CERTIFICATION DOCUMENTSRetirements
Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions |
---|---|---|---|---|---|---|---|