Efeler Biogas Power Plant

GS ID

1282

Region

Turkey

Loading...

planned SDG Impacts

Affordable and Clean Energy
Decent Work and Economic Growth
Climate Action

Project Type

Biogas - Cogeneration
Biogas - Cogeneration

Status

Listed

Listed

Project Developer

GAİA CLİMATE FİNANSAL DANIŞMANLIK HİZMETLERİ VE TİCARET ANONİM ŞİRKETİ (GAIA CLIMATE)

Methodology

Not provided

Crediting Period

Aug 15, 2013 ― Aug 14, 2018

Standards Version

Gold Standard for the Global Goals

Annual Estimated Credits

70,000

Project Scale

Small Scale

Project Type

Biogas - Cogeneration

Description

The purpose of Efeler BPP Project is to use solid and liquid waste from the Efeler Farm to produce green energy. The Efeler Farm is located in Germencik district of Aydýn province in Turanlar Village, in Turkey. The BPP will have an installed capacity of 2.4 MW. The total electricity production of the project is expected to be some 19,200 MWh/year. In addition a heat generation of 22,130 MWh/year is expected. In addition to produce electricity from the solid and liquid waste, there are some other benefits of the project: • Environmental impact of waste will be eliminated. • The harmful gases, which released into the air, will be blocked. • The small amount of organic manure that occurs after the process will be evaluated in positive way. • The efficiency of milk amount will be improved due to the cold air, which will be obtained from the chiller after converting the hot water to the cold air in chiller.

Issuance List

Vintage
Quantity
Product
Issuance Date
Actions

Loading...

0 of 0

Certification Documents

VIEW CERTIFICATION DOCUMENTS

Retirements

Date
Vintage
Serial Number
Quantity
Product
Status
Note
Actions

Loading...

0 of 0