Gold Standard Foundation

InfraVest Taiwan Wind Farms Bundled Project 2011 - Taiwan

GS ID

1001

Region

Taiwan

InfraVest Taiwan Wind Farms Bundled Project 2011 - Taiwan

Product

VER

VER

976517

Issued

875516

Retired

certified SDG Impacts

Affordable and Clean Energy
Decent Work and Economic Growth
Climate Action

Project Type

Wind
Wind

Status

Gold Standard Certified Project

Gold Standard Certified Project

Project Attributes

Emission Reduction

Project Developer

South Pole Carbon Asset Management Ltd.

Methodology

ACM0002 Grid-connected electricity generation from renewable sources

Crediting Period

Feb 01, 2014 ― Jan 31, 2021

Standards Version

Gold Standard for the Global Goals

Annual Estimated Credits

264,960

Project Scale

Large Scale

Project Type

Wind

Description

The InfraVest Taiwan Wind Farms Bundled Project 2011(hereinafter referred to as “the project”) is a bundled project of four wind farms projects: • InfraVest Fongwei Wind Farm Project, Taiwan: a 13.8 MW (6x2.3 MW) onshore wind farm located in Hsinfong Township (therefore also called Hsinfong Wind Farm), Hsinchu County, which comprises 6 wind turbines (hereafter: Fongwei Wind Farm). • InfraVest Longwei Wind Farm Project, Taiwan: a 44.1 MW (18x2.3 MW + 3x0.9 MW) onshore wind farm located in Houlong Township (therefore also called Houlong Wind Farm), Miaoli County, which comprises 21 wind turbines (hereafter: Longwei Wind Farm). • InfraVest Chungwei Wind Farm Project, Taiwan: a 29.9 MW (13x2.3 MW) onshore wind farm located in Dajia and Da-An Townships, Taichung County, which covers Taichung phases I and III, and Dafong sites, and which comprises 13 wind turbines (hereafter: Chungwei Wind Farm). There are another 20 wind turbines also located in Dajia and Da- An Townships, Taichung County, which belong to the same project owner. But these 20 turbines belong to the project owner’s another GS VER project (GS472), which was already registered in 2010. Therefore, the 13 wind turbines in Chungwei Wind Farm under the project are the capacity addition to the existing grid-connected renewable power plant (project GS472). • InfraVest Tauwei Wind Farm Project, Taiwan: a 4.6 MW (2x2.3 MW) onshore wind farm located in Guanyin Township (also called Hsinwu Wind Farm), Taoyuan County, which comprises 2 wind turbines (hereafter: Tauwei Wind Farm). There are another 19 wind turbines also located in Guanyin Township, Taoyuan County, which belong to the same project owner. But these 19 turbines belong to the project owner’s another GS VER project (GS612), which was already registered in 2011. Therefore, the 2 wind turbines in Tauwei Wind Farm under the project are the capacity addition to the existing grid-connected renewable power plant (project GS612). The above-mentioned four wind farms are constructed and operated by InfraVest Wind Power Group (hereafter refer as “InfraVest”), which is a subsidiary of Germany based VWind AG. The project in total comprises 42 wind turbines and the total installed capacity of the bundled project is 92.4 MW. At full capacity, the aggregated output of the project is expected to be of 250,866 MWh/year, which is to be delivered to the state-owned power grid, Taipower grid (“TPG”), displacing part of the electricity supplied by the power grid currently dominated by fossil fuel-fired power plants. Accordingly, the project will lead to carbon dioxide emission reduction. The annual emission reductions are estimated as 190,908 tCO2e/year, and the total emission reductions for the first crediting period of 7 years are estimated as 1,336,356 tCO2e.

Issuance List

Vintage
Quantity
Product
Issuance Date
Actions
2020108960
VER

VER

Dec 08, 2021VIEW
2019161285
VER

VER

Nov 17, 2020VIEW
2018149810
VER

VER

Feb 24, 2020VIEW
2017161280
VER

VER

May 29, 2018VIEW
201691066
VER

VER

Oct 03, 2017VIEW
201596199
VER

VER

Oct 19, 2016VIEW
201652916
VER

VER

Oct 19, 2016VIEW
201560
VER

VER

Feb 16, 2016VIEW
2014115336
VER

VER

Nov 24, 2015VIEW
201539605
VER

VER

Nov 24, 2015VIEW
1-10 of 10

Certification Documents

VIEW CERTIFICATION DOCUMENTS

Retirements

Date
Vintage
Serial Number
Quantity
Product
Status
Note
Actions
Apr 11, 20242020GS1-1-TW-GS1001-12-2020-22066-108677-108960284
VER

VER

Retired

Retired

Note: Credits retired on behalf of the City of Melbourne’s Now or Never Festival 2024VIEW
Oct 13, 20232020GS1-1-TW-GS1001-12-2020-22066-106098-106797700
VER

VER

Retired

Retired

Note: Retired on behalf of Netze-Gesellschaft Südwest mbHVIEW
Oct 04, 20232020GS1-1-TW-GS1001-12-2020-22066-105348-106097750
VER

VER

Retired

Retired

Note: Retired on behalf of Åtta.45 Tryckeri AB to match their unabated emissions generated during 2022.VIEW
Sep 01, 20232020GS1-1-TW-GS1001-12-2020-22066-104798-105347550
VER

VER

Retired

Retired

VIEW
Jul 10, 20232020GS1-1-TW-GS1001-12-2020-22066-102429-1047972369
VER

VER

Retired

Retired

Note: Retired on behalf of Melbourne Arts Precinct Corporation to offset emissions for financial year 2023VIEW
Jun 23, 20232020GS1-1-TW-GS1001-12-2020-22066-101292-1024281137
VER

VER

Retired

Retired

VIEW
Jun 23, 20232020GS1-1-TW-GS1001-12-2020-22066-100542-101291750
VER

VER

Retired

Retired

Note: Retired on behalf of Netze-Gesellschaft Südwest mbHVIEW
Oct 07, 20222020GS1-1-TW-GS1001-12-2020-22066-99942-100541600
VER

VER

Retired

Retired

Note: Retired on behalf of City of Melbourne for Climate Active carbon neutral organisation FY21/22VIEW
Aug 26, 20222020GS1-1-TW-GS1001-12-2020-22066-99692-99941250
VER

VER

Retired

Retired

Note: Retired on behalf of Netze-Gesellschaft Südwest mbHVIEW
Aug 01, 20222020GS1-1-TW-GS1001-12-2020-22066-84692-9969115000
VER

VER

Retired

Retired

Note: Retired on behalf of Karora Resources as part of their commitment to reduce and offset emissions across their operations and corporate offices. These offsets were selected as part of a comprehensive reduction and offset plan Karora is developing to achieve Net Zero emissions status in the future – the first junior gold miner to do so.VIEW
Apr 21, 20222020GS1-1-TW-GS1001-12-2020-22066-74692-8469110000
VER

VER

Retired

Retired

Note: Retired on behalf of Haglöfs AB against their 2021 carbon footprint VIEW
Apr 21, 20222020GS1-1-TW-GS1001-12-2020-22066-62692-7469112000
VER

VER

Retired

Retired

Note: Retired on behalf of Haglöfs AB against their 2021 carbon footprint VIEW
Mar 31, 20222020GS1-1-TW-GS1001-12-2020-22066-60537-626912155
VER

VER

Retired

Retired

Note: Retired on behalf of VistaJet VIEW
Jan 27, 20222020GS1-1-TW-GS1001-12-2020-22066-52180-605368357
VER

VER

Retired

Retired

VIEW
Feb 21, 20242020GS1-1-TW-GS1001-12-2020-22066-16607-5217935573
VER

VER

Retired

Retired

Note: EE Care Inkoopgroep A 2024VIEW
Dec 21, 20232020GS1-1-TW-GS1001-12-2020-22066-13507-166063100
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - November 2023VIEW
Nov 27, 20232020GS1-1-TW-GS1001-12-2020-22066-11507-135062000
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - Oktober 2023VIEW
Oct 24, 20232020GS1-1-TW-GS1001-12-2020-22066-10707-11506800
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - September 2023VIEW
Sep 26, 20232020GS1-1-TW-GS1001-12-2020-22066-9907-10706800
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - Augustus 2023VIEW
Aug 24, 20232020GS1-1-TW-GS1001-12-2020-22066-9107-9906800
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - Juli 2023 VIEW
Jul 14, 20232020GS1-1-TW-GS1001-12-2020-22066-8107-91061000
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - Juni 2023VIEW
Jun 27, 20232020GS1-1-TW-GS1001-12-2020-22066-6607-81061500
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - Mei 2023VIEW
May 25, 20232020GS1-1-TW-GS1001-12-2020-22066-2180-66064427
VER

VER

Retired

Retired

Note: Vattenfall NL - (VastePrijs)Gas met CO2-compensatie - April 2023VIEW
Jan 25, 20222020GS1-1-TW-GS1001-12-2020-22066-1-21792179
VER

VER

Retired

Retired

Note: Retired by Gold Standard to compensate for potential over-issuance from Safe Water Supply projects identified by 2020-initiated grievance investigation. 2022 installment #1VIEW
Oct 26, 20222019GS1-1-TW-GS1001-12-2019-20258-119286-14128522000
VER

VER

Retired

Retired

Note: Retired on behalf of Northwest Commonwealth (dba Wyld & Wyld CBD)VIEW
1-25 of 483