GS ID
3965
Region
India
Loading...
certified SDG Impacts
Project Type
Status
Gold Standard Certified Project
Project Attributes
Project Developer
Orange Renewable Power Pvt Ltd
Methodology
ACM0002 Grid-connected electricity generation from renewable sources
Crediting Period
Apr 01, 2022 ― Mar 31, 2029
Standards Version
Gold Standard for the Global Goals
Annual Estimated Credits
43,328
Project Scale
Large Scale
Project Type
Wind
Description
GHBPL is installing wind power project in the villages of Pratapgarh district of Rajasthan state, India. The purpose of the project activity is to generate electrical power using wind energy through operation of Wind Electric Generators (WEG’s). The total installed capacity of the project activity is 22.5 MW comprising of 15 ReGen wind turbines of 1500 kW capacity each.
Issuance List
Vintage | Quantity | Product | Issuance Date | Actions |
---|---|---|---|---|
Loading... |
Certification Documents
VIEW CERTIFICATION DOCUMENTS IN SUSTAINCERTRetirements
Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions |
---|---|---|---|---|---|---|---|
Loading... |