GS ID
5009
Region
Turkey
Loading...
certified SDG Impacts
Project Type
Status
Gold Standard Certified Project
Project Attributes
Project Developer
AKIS ENERJI YATIRIM ÜRETIM VE TICARET ANONIM SIRKETI
Methodology
ACM0002 Grid-connected electricity generation from renewable sources
Crediting Period
Jan 10, 2021 ― Jan 09, 2026
Standards Version
Gold Standard for the Global Goals
Annual Estimated Credits
160,601
Project Scale
Large Scale
Project Type
Wind
Description
The Soke (Akis) Wind Power Plant (will be refered to as Soke (Akis) WPP from this point forward) is a wind farm that is planned to be constructed by “Akis Enerji Yatirim Üretim ve Tic. A.S." in the vicinity of Söke town of Aydin Province. The wind farm is going to convert the potential energy of the wind into electricity by means of 29 to 31 wind turbines with a total total generation capacity of 104 MW.The project is a large scale, Voluntary Emission Reduction. The host Country is the Republic of Turkey, which is an Annex-1 Party to the UNFCCC. Although Turkey has ratified the Kyoto Protocol, due to its special circumstances, Turkey is not listed in Annex-B of the protocol and does not have a binding emission reduction target. Therefore projects hosted by Turkey are eligible under the Gold Standard voluntary regime. The type of the project activity fits in the ‘Renewable Energy Supply" category and this category is defined as “Generation and Delivery of Energy Services" from “non-fossil" and “non-depleatable" energy sources.
Certification Documents
VIEW CERTIFICATION DOCUMENTSRetirements
Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions |
---|---|---|---|---|---|---|---|
Loading... |