GS ID
1134
Region
Turkey
Loading...
certified SDG Impacts
Project Type
Status
Gold Standard Certified Project
Project Attributes
Project Developer
Aksu Temiz Enerji Elekt. Uret. San. ve Tic. A. S.
Methodology
ACM0002 Grid-connected electricity generation from renewable sources
Crediting Period
Oct 24, 2022 ― Oct 23, 2029
Standards Version
Gold Standard for the Global Goals
Annual Estimated Credits
125,869
Project Scale
Large Scale
Project Type
Wind
Description
Aksu Wind Farm Project involves the development of a 72 MW onshore wind farm in the Central Part of Turkey, in Kayseri Province, Yahyali District. The generated electricity will be delivered to the Turkish National Grid. The project will be implemented with the instalment of 36 turbines, each having a 2 MW output power, and the development of a high voltage transmission line between the proposed project area and the national grid. An estimated net electricity of 194 GWh/year will be produced by the project activity and delivered to the national grid. The estimated emission reductions will be about 118,737 tCO2-eq/years.
Issuance List
Vintage | Quantity | Product | Issuance Date | Actions |
---|---|---|---|---|
Loading... |
Certification Documents
VIEW CERTIFICATION DOCUMENTS IN SUSTAINCERTRetirements
Date | Vintage | Serial Number | Quantity | Product | Status | Note | Actions |
---|---|---|---|---|---|---|---|
Loading... |